The works consisted of widening existing carriageway, correction of base failures and the construction of a concrete road (designed according to the American Concrete Institute’s Guide for Design of Jointed Concrete), taking into account the wet soil condition and frequent flooding of the area. The project also incorporated the construction of a four-lane...
Hambantota Port Bypass Road
This is a vital bypass road that connects the Matara–Wellawaya road to city of Hambantota and acts as a critical diversion around the Hambantota Port. Eventually proposed to become a 6-lane road, the construction was carried out within an accelerated time period of 1 month, in lieu of its urgent necessity as conveyed...
Weerawila-Kataragama Road
This road rehabilitation project included improvements to both Weerawila – Kataragama Road (25.9km) and Dickwella – Beliatta Road (13.3km) running across the Southern and Uva Province of the country.
Carried out simultaneously, the double bituminous surface treatment of the roads aimed at improving the traffic flow around the culturally diverse city of...
Kalutara–Ambalangonda Road
The project comprised the rehabilitation of this key section of the Colombo Galle road, widely considered the busiest coastal road of the country, under the World Bank Funded Tsunami Emergency Recovery Program (TERP) Phase II.
The project was a Joint Venture with China Dalian Economic and Technical Cooperative Group. The road was...