Construction of this 99m span, single-spanned steel-trussed bridge on bored piles was completed in August 2003. The Main Contractor for the project was Kumagai Gumi Co. Ltd of Japan.
The bridge was designed by Oriental Consultants of Japan.
...Construction of this 99m span, single-spanned steel-trussed bridge on bored piles was completed in August 2003. The Main Contractor for the project was Kumagai Gumi Co. Ltd of Japan.
The bridge was designed by Oriental Consultants of Japan.
...The construction of this 99-m long post-tensioned bridge involved the casting of post-tensioned beams (3 I-girders each 32.8m long) and the construction of the abutments, retaining walls and piers.
Kumagai Gumi Co. Ltd of Japan was the Main Contractor for the project, and the bridge was designed by Oriental Consultants of Japan.
...